With Oracle JET pages and JD Edwards EnterpriseOne orchestrations, we’ve built a handy tool to boost manufacturing efficiency. Thanks to a simple UI, your team on the shop floor and the production manager can easily assess and act on EnterpriseOne data.
Make your operators lives easier and reduce manual data-entry errors with this intuitive user interface. During the working day or at the end of the shift, the operator can automatically record time given to specific tasks.
If you have to interrupt operations, you can control the range of options to choose and you can either let the time be calculated automatically or manually update it.
EnterpriseOne will be updated in real-time. You can customise the system to your needs with a list of time to be recorded.
This data can then be aggregated to anaylse production efficiency.
Analyse and act on any capacity issues thanks to an intuitive dashboard with drag and drop scheduling capabilities.
Green = Remaining Capacity Available Blue = unvalidated order Orange = validated order
The calendar can be displayed for 1 month, 2 months or 2 weeks. Today ‘s date can also be selected. It is possible to change the date for an operation using drag and drop capabilities.
When an operation is moved to another date the following action is performed, the standard E1 Orchestration is called. This orchestration adjusts the WO requested date by the number of days we have moves (backward or forward) the operation. Then the standard E1 capabilities are used to recalculate the starting and ending date for all the operation in the Work Order routing.
Please complete the form and our Global Enquiries team will be in touch to help you.
UK: +44 118 9653 904
IRL: + 353 61 512 840